Solusi
Horse Construction menawarkan rangkaian lengkap material perkuatan struktur dengan dukungan teknis, dukungan dokumentasi, dukungan produk, dukungan perangkat lunak, dukungan proyek.
The reason of void between steel plate and concrete ,Inappropriate grinding and cleaning of the surface of the steel plate,The surface of concrete is wet or the humidity in the air is high
1.Inappropriate grinding and cleaning of the surface of the steel plate
solution:
1)The steel plate should be polished, rusted and cleaned with acetone
2)The treated steel plate should be constructed as soon as possible to avoid further corrosion and pollution.
2.The surface of concrete is wet or the humidity in the air is high
solution:
1)Ventilation and dehumidification
2)Avoid large-area operations of construction components attachments at the same time (such as wall plastering)
Anda dapat menemukan segala yang Anda butuhkan di sini. Percayalah dan cobalah produk - produk ini, Anda akan menemukan perbedaan yang besar setelah itu.
Perekat pengikat pelat baja struktural HM-120 adalah produk epoksi dua komponen, dengan daya rekat kuat, pengerasan pada suhu ruangan. Produk ini memiliki sifat anti-penuaan dan ketahanan guncangan yang sangat baik dalam daya rekat sendiri dan daya rekat t
Perekat pelapisan pelat baja HM-120M adalah perekat perfusi struktural bangunan resin epoksi termodifikasi tipe baru, khususnya untuk mendukung tulangan batang yang terikat perekat. Perekat ini dapat diikat dengan berbagai substrat dan logam, dengan keungg
Epoxy penahan injeksi Horse HM-500 adalah bahan penahan tiksotropik berbasis resin epoksi 2 komponen berkinerja tinggi untuk batang dan tulangan, cocok untuk digunakan pada beton kering dan basah.