Solusi
Horse Construction menawarkan rangkaian lengkap material perkuatan struktur dengan dukungan teknis, dukungan dokumentasi, dukungan produk, dukungan perangkat lunak, dukungan proyek.
The gap between steel plate and concrete is not uniform, and the injection speed is too fast,so poor bond strength between steel plate and concrete
The injection hole and the vent hole are not set properly, and the glue injection construction sequence is incorrect
Solution
1)The spacing between the rubber injection hole and the exhaust hole should be determined according to the actual situation, generally should not exceed 50CM
2)The bottom of the adhesive steel plate should be equipped with plastic injection holes. Vent holes should be provided at the highest position, edge, and corner. After confirming that the exhaust hole has been filled with plastic and the glue has been evenly discharged, the exhaust hole is sealed. Blocking
3)Adhere to the principle of low to high and from one end to the other during glue injection to avoid unordered operation and to ensure that the rubber injection nozzle and exhaust hole are adjacent to each other and then change the position of glue injection.
4)When tapping, tap the steel plate with a small hammer to determine the flow direction of the glue and adjust the operation in time
The gap between steel plate and concrete is not uniform, and the injection speed is too fast
Solution
1)Make sure that the gap between steel plate and concrete is as uniform as possible
2)Uniformly low-speed glue injection to ensure the glue penetration and flow time
3)When tapping the rubber, tap the steel plate with a small hammer to determine the flow direction of the glue and adjust the operation in time.
As the glue penetrates into the concrete, it causes the glue layer at the top or corner to become empty
Solution
1)Low speed and slow injection
2)The rubber injection hole and vent hole in the highest position should be held in pressure, and should be promptly added when the position of the glue drops.
3)Vent hole should be set at the highest position or corner
Lack of sealing leads to leakage of glue
Solution
1)Ensure that the steel plate, injection nozzle, and vent hole are not leaky
2)Timely plugging of rubber injection nozzles and vents
Construction pause
Solution
1)Full preparation before construction
2)The glue layer has been found to have become void after curing, and the steel plate can be used to make additional injections of plastic injection holes and exhaust holes.
Material link: http://www.horseen.com/steel-plate-bonding-system/perfusion-steel-plate-bonding
Anda dapat menemukan segala yang Anda butuhkan di sini. Percayalah dan cobalah produk - produk ini, Anda akan menemukan perbedaan yang besar setelah itu.
Perekat pengikat pelat baja struktural HM-120 adalah produk epoksi dua komponen, dengan daya rekat kuat, pengerasan pada suhu ruangan. Produk ini memiliki sifat anti-penuaan dan ketahanan guncangan yang sangat baik dalam daya rekat sendiri dan daya rekat t
Perekat pelapisan pelat baja HM-120M adalah perekat perfusi struktural bangunan resin epoksi termodifikasi tipe baru, khususnya untuk mendukung tulangan batang yang terikat perekat. Perekat ini dapat diikat dengan berbagai substrat dan logam, dengan keungg
Epoxy penahan injeksi Horse HM-500 adalah bahan penahan tiksotropik berbasis resin epoksi 2 komponen berkinerja tinggi untuk batang dan tulangan, cocok untuk digunakan pada beton kering dan basah.