With the increase of service years of buildings, the durability of columns decreases and the strength and stiffness of columns are insufficient due to the defects or the constant changes of load and environment. The failure of concrete columns is sudden and easy to cause accidents. Today, we talk more about steel jacketing of the column by perfusion adhesive.
Concrete columns, as the main load-bearing structures in buildings, are one of the main components of various buildings. With the increase of service years of buildings, the durability of columns decreases and the strength and stiffness of columns are insufficient due to the defects or the constant changes of load and environment. The failure of concrete columns is sudden and easy to cause accidents. Therefore, it is necessary to pay attention to the state of concrete columns and reinforce the defective columns.
Today, we talk more about steel jacketing of the column by perfusion adhesive.
You can see the video, Horse Construction spent a lot of money and time make it. You can learn more from the video.
Link: https://www.horseen.com/Horse-Construction-video/Structural-Strengthening-Adhesive-Steel-Jacketing
If you are not convenient to watch our video, you can also read the text.
1.1 Original structure clean
Remove surface coating until concrete surface appear. Make it clear and sound.
1.2 Surface treatment
Grinding surface smooth and chamfer angles.
1.3 Structure repair
Repair and level concrete defects with repairing adhesive.
1.4 Position&paying off
Locate the set out according to the drawing.
1.5 Steel treatment
Grind and roughen adhering of angle bar and batten plate.
1.6 Steel skeleton install
Install gasket, clamp steel skeleton with special fixtures. Leave 2 to 3 mm gap between steel skeleton and original member.
1.7 Batten plate weld
Weld batten plate and steel skeleton, weld should be straight, uniform, no virtual welding, leakage welding.
1.8 Position&drill,embed injection device
Embed injection nozzle and exhaust hole according to design.
1.9 Crack seal
Seal gaps between angle bars and batten plates with horse crack repair adhesive.
1.10 Air pressure test
After crack repair adhesive is cured, test pressure with air and if there is leak, seal it in time.
1.11Adhesive mix
Mix the horse structural perfusion adhesive according to the ratio. Mix and stir evenly avoid bubbles, do not mix too much adhesive once to avoid waste.
1.12 Perfusion application
Inject horse perfusion adhesive via injection nozzles, with low pressure. Stop injecting when the adhesive appears in the near exhaust hole. Seal the exhaust hole and keep injecting adhesive with low pressure for 10 minutes. After adhesive is cured, remove injection devices and extra adhesive.
1.13 Curing maintenance
72 hours curing and maintenance time is needed after injection construction.
1.14 Quality inspection
Check if there is hollowness after adhesive is cured.
1.15 Protection treatment
Finally apply anti-corruption and anti-fire coating.
Anda dapat menemukan segala yang Anda butuhkan di sini. Percayalah dan cobalah produk - produk ini, Anda akan menemukan perbedaan yang besar setelah itu.
Perekat pengikat pelat baja struktural HM-120 adalah produk epoksi dua komponen, dengan daya rekat kuat, pengerasan pada suhu ruangan. Produk ini memiliki sifat anti-penuaan dan ketahanan guncangan yang sangat baik dalam daya rekat sendiri dan daya rekat t
Perekat pelapisan pelat baja HM-120M adalah perekat perfusi struktural bangunan resin epoksi termodifikasi tipe baru, khususnya untuk mendukung tulangan batang yang terikat perekat. Perekat ini dapat diikat dengan berbagai substrat dan logam, dengan keungg
Perekat penyegel retak HM-9 adalah perekat resin epoksi termodifikasi dua komponen, yang sering digunakan dengan perekat retak tuang untuk penyegelan retakan dan pemasangan nosel injeksi.