Horse Construction menawarkan rangkaian lengkap material perkuatan struktur dengan dukungan teknis, dukungan dokumentasi, dukungan produk, dukungan perangkat lunak, dukungan proyek.
Carbon fiber sheet reinforced railway canopy
Project Overview
The basic platform awning of Wenzhou Railway Station was built in 1998. The soil distribution of the site is as follows: 1. Artificial fill with a thickness of more than 3m. 2. Clay, gray-yellow, gray-brown, yellow-brown, with a thickness of less than 1.0m. 3. Muddy clay, dark gray, flow plastic, thickness greater than 30m, this layer has not penetrated. The original structure foundation is 600 friction-type bored piles, the pile length is 32m, single column and double pile. The maximum settlement at completion is 5mm. According to the basic platform settlement observation data provided by the owner, the maximum settlement (Z2) measured on August 10, 2001 was 336mm. Among them, the differential settlement of the north-south column of the (ll) axis was 120mm, and the inclination was 21.8 per thousand. The differential settlement of the four-axis north-south column is 250mm, and the inclination rate is 46.95 per thousand. The settlement difference has far exceeded the national standard that is 0.003 x 5500 = 16. 5mm. In addition, most of the longitudinal beams have multiple vertical cracks at the mid-span waist, with a width of 0.4-0. 5mm, and a maximum width of 3mm. Some columns have horizontal cracks at the bottom of the beam, which has seriously affected safe use.
Cause Analysis:
1. There are multiple regular cracks in the beams and columns of the platform canopy, which is mainly caused by the excessive and uneven settlement of the pile foundation.
2. The excessive settlement of the pile foundation is composed of the following factors:
1) The large area of the backfill of the site is above 3.0m, (the original geology of the A-axis (ll), the four-axis column foundation is a river course, and the filling height exceeds 4m), resulting in a large-scale settlement of the site. The negative friction resistance of the soil to the pile foundation is the main cause of settlement.
2) The original line roadbed design does not consider the impact of car washing water on the basic platform during use, which leads to the discharge of a large amount of water on the site during use and accelerates its settlement.
3) The original design of the train line and the underpass, the main station building of the railway station, the overpass, and the basic platform canopy were designed by four design units, and the coordination of many design units was not coordinated, and the related designs had a greater cross-effect.
Reinforcement measures
1) Foundation reinforcement and frame correction and lifting plan
Combined with the actual conditions of the geological conditions of the project, the rigidity conditions of the building foundation and the superstructure, it was decided to adopt staggered static pressure piles for foundation reinforcement; to correct the inclination of the awning, adopt the plan of cutting column jacking.
Reinforced concrete frame beam reinforcement
For the frame beam of the rain canopy, the cracks are dense and the crack width is wide, and the carbon fiber sheet is pasted on the surface of the component through the matching bonding material for reinforcement. The bottom surface of the beam adopts two layers of 300-wide carbon fiber cloth and extends to the edge of the support. A layer of 400-wide carbon fiber cloth is pasted on the tension zone on the side of the beam. A layer of 100-wide carbon fiber cloth is pasted on the side of the bottom beam. In order to appropriately improve the shear resistance, one layer of U-shaped carbon fiber sheet 100@200 is pasted longitudinally on the vertical beam, and three strips and three layers are pasted on both ends of the beam and at the concentrated load.
Anda dapat menemukan segala yang Anda butuhkan di sini. Percayalah dan cobalah produk - produk ini, Anda akan menemukan perbedaan yang besar setelah itu.
Viskositas rendah, impregnasi yang baik, dengan sifat tiksotropik tertentu, digunakan untuk impregnasi dan pasta permukaan komponen yang diperkuat dan produk serat. Peran perekat serat karbon Horse adalah untuk sepenuhnya meresap ke dalam produk serat, dan
Serat karbon Horse Construction digunakan untuk perkuatan struktural, perbaikan, dan perbaikan substrat beton, pasangan bata, baja, dan kayu pada bangunan, jembatan, jalan raya, rel kereta api, terowongan, dermaga, dan bandara sipil.
Serat karbon Horse Construction digunakan untuk perkuatan struktural, perbaikan, dan perbaikan substrat beton, pasangan bata, baja, dan kayu pada bangunan, jembatan, jalan raya, rel kereta api, terowongan, dermaga, dan bandara sipil.