Why load is removed in the process of strengthening?

In order to make the new and old structure to bear force together, should first remove the original structure load before the reinforcement. It is a better way to reapply it after reinforcement.

structural reinforcement carbon fiber


There is a general problem of structural reinforcement: the stress of the newly added part will lag slightly. In order to make the new and old structure to bear force together, should first remove the original structure load before the reinforcement. It is a better way to reapply it after reinforcement.


How do you remove the load?

1.Complete and accurate unloading can be used reverse loading unloading jack; 

2.Simple unloading can be removed only live load, and avoid the construction load.


Produk Teranjum Horse Construction

Anda dapat menemukan segala yang Anda butuhkan di sini. Percayalah dan cobalah produk - produk ini, Anda akan menemukan perbedaan yang besar setelah itu.

Lembaran Serat Karbon Unidirectional HM-20

Lembaran serat karbon Horse Construction digunakan untuk perkuatan struktural, perbaikan, dan perbaikan substrat beton, pasangan bata, baja, dan kayu pada bangunan, jembatan, jalan raya, rel kereta api, terowongan, dermaga, dan bandara sipil.

Lebih Banyak >

Pelat Serat Karbon Unidirectional HM-1.2T

Pelat polimer bertulang serat karbon (CFRP) Horse adalah pelat komposit yang diawetkan terlebih dahulu, yang diikatkan ke struktur sebagai perkuatan eksternal dengan epoksi HM-120CP.

Lebih Banyak >

Sistem Laminasi Serat Karbon Prategang

Sistem Laminasi CFRP prategang Kuda (sistem CFRP pasca-tegang) mencakup perangkat penahan dan laminasi serat karbon yang dirancang khusus untuk jembatan, bangunan, dan tulangan struktur baja.

Lebih Banyak >

Back
Top
Close