Preventive measure of structural strengthening

Preventive measure of structural strengthening: CFRP strengthening, steel plate strengthening, post installed anchoring.


Preventive measure of structural strengthening


Item

Common problems

Preventive measure
Post installed anchor

The glue is not full enough; the distance between the steel bar and the hole wall is uneven

Glue injecting gun is used to post installed anchor, and two times correction is made after steel bar is implanted. The length of exposed steel bar is reasonably reserved, and the difficulty of planting bar is reduced.
Externally bonded CFRP wrapThe bond is not firm; carbon fiber cloth is not soaked; hollowing, etc.

Strengthen the grinding of the base and brush the primer glue.

The carbon fiber cloth is soaked with carbon fiber adhesive glue and then paste.

Roll along the same direction, carbon fiber selvage suitable for more glue.

Pate steel plate

Hollowing

The steel plate and the concrete surface are evenly coated with steel plate adhesive.

Strictly control the thickness of the steel plate glue.

Pressure perfusion glue is used for construction.


Produk Teranjum Horse Construction

Anda dapat menemukan segala yang Anda butuhkan di sini. Percayalah dan cobalah produk - produk ini, Anda akan menemukan perbedaan yang besar setelah itu.

Lembaran Serat Karbon Unidirectional HM-20

Lembaran serat karbon Horse Construction digunakan untuk perkuatan struktural, perbaikan, dan perbaikan substrat beton, pasangan bata, baja, dan kayu pada bangunan, jembatan, jalan raya, rel kereta api, terowongan, dermaga, dan bandara sipil.

Lebih Banyak >

Pelat Baja Epoksi HM-120

Perekat pengikat pelat baja struktural HM-120 adalah produk epoksi dua komponen, dengan daya rekat kuat, pengerasan pada suhu ruangan. Produk ini memiliki sifat anti-penuaan dan ketahanan guncangan yang sangat baik dalam daya rekat sendiri dan daya rekat t

Lebih Banyak >

Back
Top
Close